Client:
Thames Housing Association
Summary of Project:
The construction of 10 dwellings using
a prefabricated timber frame structure with external brick facings.
The mix of dwellings at this location gave a broad range for house
types on this small site
Located within
just 2 minutes walking distance from the new Croydon / Wimbledon
tram link (from which there are connections with both main-line
trains and London underground trains to central London), the houses
support a sustainable environment by reducing the necessity of
car ownership.
Data:
2 semi-detached 4 bed houses
3 No. 3 bed houses
5 No. 3 storey 3 bed house
Location:
Croydon, South London.

|